Installation of Walkways and Zebra crossings in this joint production and warehouse area.
Our client require demarcations installed in there mixed production and warehouse area to clearly identify the safe routes for pedestrians to move around and identify the crossing points on the main roadway.
We prepared the areas with our industrial floor grinders before using a variety of different Epoxy based resin materials to complete the works. We had a 2 day window to complete the installation work over a weekend to ensure no disruption occurred to our client.
Our client require demarcations installed in there mixed production and warehouse area to clearly identify the safe routes for pedestrians to move around and identify the crossing points on the main roadway.
We prepared the areas with our industrial floor grinders before using a variety of different Epoxy based resin materials to complete the works. We had a 2 day window to complete the installation work over a weekend to ensure no disruption occurred to our client.